REVOLUTIONIZING RECYCLING: Automation, Efficiency, & Reliability
Client Challenge A major recycling plant in Las Vegas, NV, needed a state-of-the-art plastics sorting line to improve sorting efficiency, reduce manual intervention, and handle increasing throughput demands. The project required the integration of equipment from 5-10 different Original Equipment Manufacturers (OEMs) while managing the operation of 200-250 motor loads. Additionally, the system needed to […]
FROM OUTDATED TO OPTIMIZED: Seamless Migration of Legacy FactoryTalk Historian to Modern OS and Upgrade
Client Challenge A plastics manufacturer sought to modernize their automation system, which was running on an outdated Windows Server 2003 operating system. The legacy system utilized FactoryTalk View Studio 2.2 for operator interfaces and for data trending, and SQL Server for production data logging to a corporate database. The system supported three operator interface PCs […]