ENERGIZING EFFICIENCY: Ash Handling System Upgrade
Client Challenge A mixed fuel power plant faced ongoing challenges with its existing ash handling system, which had been retrofitted to handle only fly ash after the original system—designed for both bottom ash and fly ash—was modified. The plant’s tertiary filters required constant monitoring, as ash accumulation frequently blinded them, resulting in inefficiencies and increased […]
BOOSTING RELIABILITY: Control System Overhaul for Cell Assembly
Client Challenge A battery manufacturer was facing significant challenges with its existing control system, which comprised seven industrial computers running proprietary software. This system was difficult to modify and support, posing obstacles to product flow control, part tracking, data collection, and quality checks. Our client also needed to reconfigure its equipment to accommodate a new […]