WEAVING EFFICIENCY: Unifying Production and HVAC Management
Client Challenge A yarn manufacturing plant was experiencing challenges in managing its production and facility systems, specifically HVAC and energy consumption. The manufacturing plant was in need of a centralized system to manage Overall Equipment Effectiveness (OEE) and Manufacturing Execution Systems (MES) for various textile machines, while also incorporating real-time data from the HVAC and […]
KEEPING IT COOL: Scalable HVAC Upgrades for Data Center Reliability
Client Challenge In 2018, a Data Center’s HVAC system was nearing the end of its lifecycle. The existing Modicon Quantum Hot Standby Control System was installed in 2012 and was responsible for controlling the chilled water systems essential for cooling the center’s servers and storage. The Modicon Quantum PLC needed to be phased out and, […]
SCALING RELIABILITY: HVAC Integration for a Pharmaceutical Leader
Client Challenge Our team was approached by a pharmaceutical facility to install a fully automated SCADA platform for a new HVAC air handler system. The system had to centralize control, integrate multiple systems, and provide real-time monitoring and alarm management for both HVAC and facility control. This project included coordinating with multiple contractors and ensuring […]